in Business Aviation

First E175-E2 jet completes its maiden flight

Posted 13 December 2019 · Add Comment

The Embraer E175-E2 made its inaugural flight today from the company’s facility in São José dos Campos. The E175-E2 is the third member of the E-Jets E2 family. The maiden flight kicks off a rigorous 24-month flight test campaign.

 

“Today’s flight of the E175-E2 marks the completion of our vision to produce a family of new-generation commercial aircraft that bring unparalleled cost savings to our customers, exceptional comfort for their passengers, and fewer emissions for the planet,” said John Slattery, President & CEO, Embraer Commercial Aviation. “The E190-E2 and the E195-E2 are already stellar performers. The E175-E2 is just as impressive. We’re eager to get working on certification. My sincere thanks to every Embraer employee who helped make this day possible.”

The E175-E2 departed at 11:07 a.m. local time from the runway adjacent to Embraer’s Faria Lima complex and flew for two hours and 18 minutes. Embraer’s Captain Mozart Louzada commanded the aircraft along with first officer Wander Almodovar Golfetto, and flight engineers Gilberto Meira Cardoso and Mario Ito. The aircraft took off and landed with fly-by-wire (FBW) controls in normal mode. The crew evaluated aircraft performance, flight quality and systems behavior.

Embraer will use three aircraft for the E175-E2 certification campaign. The first and second prototypes will be used for aerodynamic, performance and system tests. The third prototype will be used to validate maintenance tasks and will be outfitted with interior furnishings.

The E175-E2 has one additional row of seats compared to the first-generation E175 and can be configured with 80 seats in two classes, or up to 90 in a single class. The airplane will save up to 16% in fuel and 25% in maintenance costs per seat compared to the E175.

Like the E190-E2 and the E195-E2, the E175-E2 will have the longest maintenance intervals in the single-aisle jet category with 10,000 flight hours for basic checks and no calendar limit for typical E-Jet operations. This means an additional 15 days of aircraft utilization over a period of ten years compared to current generation E-Jets.

The E175-E2 features new Pratt & Whitney GTF PW1700G ultra-high bypass ratio engines, a completely new wing, full fly-by-wire controls and new landing gear. Compared to the first-generation E175, 75% of aircraft systems are new.

Other Stories
Advertisement
Latest News

IATA warns governments on high cost of testing

The International Air Transport Association (IATA) called on governments to take action to address the high cost of COVID-19 tests in many jurisdictions and urged flexibility in permitting the use of cost-effective antigen tests as an

Gulfstream exceeds 500 in-flight connectivity service installations

Gulfstream Aerospace has surpassed 500 installations of the Inmarsat Jet ConneX in-flight connectivity platform on large- cabin aircraft. The Wi-Fi solution is available on new aircraft and can be retrofitted on qualifying existing

Embraer delivered 34 jets in Q2 of 2021

Embraer delivered a total of 34 jets in the second quarter of 2021, of which 14 were commercial aircraft and 20 were executive jets (12 light and eight large).

ICAO SG highlights African aviation's growth potential

Addressing Africa’s aviation leaders last week, most notably through her opening of the 2021 AFI Aviation Week, ICAO Secretary General Dr Fang Liu highlighted the tremendous potential future for aviation in Africa that could be

Single-engine Denali aircraft joins Beechcraft turboprop family

Textron Aviation is realigning its turboprop aircraft lineup as the single-engine Beechcraft Denali (previously branded the Cessna Denali) to join the legendary twin-engine Beechcraft King Air 260 and King Air 360/360ER as part of

Rostec starts developing hydrogen-powered aircraft engines

United Engine Corporation of Rostec has started a programme to develop hydrogen-powered engines for both aviation and ground applications.

WDS SK2601090322
See us at
DAS21_BTWDS BT1202090322Aviation MENA 2022Aviation Africa 2021 BTOC